How to Scale a Phone Farm to 100+ Devices
Also in our Knowledge Base: Fleet Slot Management: Active, Free, and Assigned Nodes — structured reference version of this guide.
**Phase 1 — Pilot** — 1–2 racks, validate cable map and toolchain.
**Phase 2 — Row deployment** — Add empty chassis or catalog racks; document PSU load per row.
**Phase 3 — Cabinet** — Custom cabinet with PDU, ducted cooling, cable trays for 40–100+ nodes.
**Infrastructure checklist**
- Room amps and HVAC capacity (not just rack fans)
- Network entry points per VLAN segment
- Spare cable ratio: 10–20% of total slots
- Phased sea freight for international bulk
Contact sales with room dimensions and device inventory for Enterprise Rack Deployment package quoting.